Frame the retention question
Unlocks 1 task
Establish whether agent-handled accounts retain differently from human-handled ones, and say so with a confidence anybody can act on.
Paused at Synthesis — is waiting on Nadia Brecht. Approve publication of a null result — agent-handled accounts show no retention difference.
State the question and the decision it changes.
Agree the method before running anything.
Approve the method before any data is touched.
Held by Anselm Reyes
Approved with the null result declared in advance.
Run the cohorts and record what happened.
Turn the result into a recommendation with its confidence attached.
Approve publication of a null result — agent-handled accounts show no retention difference.
Held by Nadia Brecht
Waiting. The result is null and the CKO wants the confidence interval restated before it lands in enterprise memory.
Frame the retention question
Unlocks 1 task
State the decision it informs
Unlocks 1 task
joins from Question
Design the cohort method
Unlocks 1 task
Define success criteria and the null result
Unlocks 1 task
Assemble the account dataset
Unlocks 1 task
joins from Method
Run the paired cohorts
Unlocks 1 task
Record observations at each interval
Unlocks 1 task
Check for account-size confounds
Unlocks 1 task
joins from Execution
Write the findings
Unlocks 1 task
State the recommendation and its confidence
Ready — every dependency closed
Unlocks 1 task
File the finding to enterprise memory
Waiting on 1: State the recommendation and its confidence
One column per stage, in routing order. Tasks inside a stage run in parallel; the first task of each stage joins from every task of the one before it, which is the hand-off between departments made explicit.
Empty
File the finding to enterprise memory
Empty
State the recommendation and its confidence
Empty
Frame the retention question
State the decision it informs
Design the cohort method
Define success criteria and the null result
Assemble the account dataset
Run the paired cohorts
Record observations at each interval
Check for account-size confounds
Write the findings
Approve the method before any data is touched.
Approved with the null result declared in advance.
Approve publication of a null result — agent-handled accounts show no retention difference.
Waiting. The result is null and the CKO wants the confidence interval restated before it lands in enterprise memory.
Deciding a gate writes the decision and nothing else. The status change, the release of downstream stages and the “ready to close” state are all derived from it on the next render — which is why an approval here is one field rather than a transaction.
The result is null and that is the finding. It is worth filing precisely because nobody expected it.
Open in the Hub →Account size was the confound. Controlled for it, the gap disappears entirely.
Open in the Hub →Task-weighted, not stage-weighted. A two-hour approval stage and a two-hundred-hour build stage are not half the work each, and treating them as such is the usual way a project dashboard reports 50% before anything has been built.
Closed when the findings exist as a memory record — whatever the result turned out to be.
The named deliverable exists as a memory record linked to this workflow.
Held at Nadia Brecht's executive gate.
Computed by engine.peekAdvance(), which returns the next stage rather than moving to it. The Task Orchestrator owns the write; keeping this side pure is what lets a card show “next: Engineering” with no risk that rendering a page advances a workflow.
Nothing here executes. There is no scheduler, no queue and no writer — these are evaluations of the current state, refreshed on every render. Adding a trigger is one row in AUTOMATION_TRIGGERS; it appears on every workflow immediately so a rule can be checked against real data before anything is built to act on it.
Workflow Engine Opened the executive gate on Synthesis — publication of a null result.
Delta Closed Execution — confound identified and controlled.
Anselm Reyes Approved the method gate with the null result declared in advance.
CEO Opened from the Research Project template — 4 stages, 2 approval gates.